The greens complex was situated on a hillside with no room for a player to miss the green.
This caused the green to suffer from silt being washed across the putting surface. The green also had sunlight and airflow issues that have been addressed before this renovation.
We started by grading out the hillside. We only had to lower one set of irrigation heads approximately 8". We did locate the greens drain Clean out under 6" of dirt.
The hillside after grading. All the dirt removed was used to build up the left side of the green to enlarge the greens complex.
The retaining wall under construction.
Laying the sod. We did a Zeon Zoysia collar and the rest of the area is Tifgrand Bermudagrass. We even Had the owner (Tony) and G.M. (James) helping to lay all the sod.
The sod is down, the wall is up, and the water is being laid to it.